UK to Gather Energy from Gas Pipelines Using Mini-Turbines
Tuesday, January 6, 2009 19:24Mini turbines will be installed inside the UK’s gas pipeline grid later this year in an attempt to gather energy from pipeline pressure. The set-up will be tested in east London and should produce 20MW by 2010. If successful, future installations across the country could produce up to 1GW. That’s the same amount of power produced by a coal or nuclear power station.





